top of page
BORTECH DTH ''NEVER HAND TUNNEL  AGAIN"
HORIZONTAL UTILITY TUNNELS IN ALL GROUND FORMATIONS OPERATED REMOTELY 

BOULDERS-COBBLES-HARD ROCK WITH EASE  TO 48" DIMATER HOLE SIZES

PROJECTS AND TRENCHLESS METHODS

DSC_0046.JPG

2 0 20

WHITE PLAINS NY
NYS-DOT

DTH-HAMMER

Bortech DTH Completed a 200' long 48" utility tunnel under the Sprain Brook Parkway. Zones of boulders, cobbles and ledge rock were encountered

2010

BOSTON, MA
BROWNSFIELD SITE

National Grid Malden River Isolating Hazmat Soils. Pilot hole intercept to drill into surface casing to  Installing  Fusible PVC Twin Duct Bank Bundle.

IMG_20200707_105240.jpg

2020

TAPPAN, NY
URBAN DRILL SITES

Con Edison hired Bortech for a design build to cross water channels and existing underground utilities.

IMG_20201116_102217.jpg

2020

MOUNT VERNON, NY
 

American Water chose Bortech's DTH to cross under streams with boulders and cobbles along the bore path.

01

04  /  26  /  2011

02

05  /  01  /  2017

Robins Manufacturing features Bortech in Trenchless Technology for their part in the SBU-A developement.

BORTECH INC. NEWS

bottom of page